A new study [PDF] puts the generation costs for power from new nuclear plants at from 25 to 30 cents per kilowatt-hour — triple current U.S. electricity rates!
This staggering price is far higher than the cost of a variety of carbon-free renewable power sources available today — and 10 times the cost of energy efficiency (see here).
The new study, Business Risks and Costs of New Nuclear Power [PDF], is one of the most detailed cost analyses publicly available on the current generation of nuclear power plants being considered in this country. It is by a leading expert in power plant costs, Craig A. Severance. A practicing CPA, Severance is co-author of The Economics of Nuclear and Coal Power (Praeger 1976), and former Assistant to the Chairman and to Commerce Counsel, Iowa State Commerce Commission.
This important new analysis is being published by Climate Progress because it fills a critical gap in the current debate over nuclear power — transparency. Severance explains:
All assumptions, and methods of calculation are clearly stated. The piece is a deliberate effort to demystify the entire process, so that anyone reading it (including non-technical readers) can develop a clear understanding of how total generation costs per kWh come together.
As stunning as this new, detailed cost estimate is, it should not come as a total surprise. I detailed the escalating capital costs of nuclear power in my May 2008 report, “The Self-Limiting Future of Nuclear Power.” And in a story last week on nuclear power’s supposed comeback, Time magazine notes that nuclear plants’ capital costs are “out of control,” concluding:
Most efficiency improvements have been priced at 1¢ to 3¢ per kilowatt-hour, while new nuclear energy is on track to cost 15¢ to 20¢ per kilowatt-hour. And no nuclear plant has ever been completed on budget.
Time buried that in the penultimate paragraph of the story!
Yet even Time‘s rough estimate is too low, as Business Risks and Costs of New Nuclear Power [PDF] quantifies in detail. Here is the Executive Summary:
It has been an entire generation since nuclear power was seriously considered as an energy option in the U.S. It seems to have been forgotten that the reason U.S. utilities stopped ordering nuclear power plants was their conclusion that nuclear power’s business risks and costs proved excessive.
With global warming concerns now taking traditional coal plants off the table, U.S. utilities are risk averse to rely solely on natural gas for new generation. Many U.S. utilities are diversifying through a combination of aggressive load reduction incentives to customers, better grid management, and a mixture of renewable energy sources supplying zero-fuel-cost kWh’s, backed by the KW capacity of natural gas turbines where needed. Some U.S. utilities, primarily in the South, often have less aggressive load reduction programs, and view their region as deficient in renewable energy resources. These utilities are now exploring new nuclear power.
Estimates for new nuclear power place these facilities among the costliest private projects ever undertaken. Utilities promoting new nuclear power assert it is their least costly option. However, independent studies have concluded new nuclear power is not economically competitive.
Given this discrepancy, nuclear’s history of cost overruns, and the fact new generation designs have never been constructed any where, there is a major business risk nuclear power will be more costly than projected. Recent construction cost estimates imply capital costs/kWh (not counting operation or fuel costs) from 17-22 cents/kWh when the nuclear facilities come on-line. Another major business risk is nuclear’s history of construction delays. Delays would run costs higher, risking funding shortfalls. The strain on cash flow is expected to degrade credit ratings.
Generation costs/kWh for new nuclear (including fuel & O&M but not distribution to customers) are likely to be from 25 – 30 cents/kWh. This high cost may destroy the very demand the plant was built to serve. High electric rates may seriously impact utility customers and make nuclear utilities’ service areas noncompetitive with other regions of the U.S. which are developing lower-cost electricity.
I am not saying here that nuclear power will play no role in the fight to stay below 450 ppm of atmospheric CO2 concentrations and avoid catastrophic climate outcomes. Indeed, I have been including a full wedge of nuclear in my 12 to 14 wedges “solution” to global warming here. It may, however, be time to reconsider that, since it is increasingly clear achieving even one wedge of nuclear will be a very time-consuming and expensive proposition, probably costing $6 to $8 trillion and sharply driving up electricity prices.
Given the myriad low-carbon, much-lower-cost alternatives to nuclear power available today — such as efficiency, wind, solar thermal baseload, solar PV, geothermal, and recycled energy (see here) — the burden is on the nuclear industry to provide its own detailed, public cost estimates that it is prepared to stand behind in public utility commission hearings.
What is unique about this new analysis [PDF] is its transparency: “all assumptions, and methods of calculation are clearly stated.” As Severance explains:
In contrast to this transparency, many nuclear promoters have adopted a “Black Box” approach. It has unfortunately been the case over the last couple of years that some utilities have begun to claim that even rudimentary basics of their nuclear cost estimates must be hidden from the public as “trade secrets”. For instance, in the South Carolina Electric & Gas proposal to build two reactors now under consideration by the South Carolina PSC, there is literally a large “box” obscuring the bulk of the calculations in the SC E&G Exhibit which presents the utility’s projection of construction and financing costs for the proposed two-unit facility. In a different case, Duke Energy claimed that it does not even have to disclose its new cost estimates for a proposed nuclear facility in Cherokee County, S.C.. In the Duke case, C. Dukes Scott, South Carolina’s consumer advocate, who represents the public in utility rate cases, noted, “If the cost wasn’t confidential in February,” Scott said, “how is it confidential in April?”
Even when no effort to conceal information is apparent, the very terminology used when projections are presented can be confusing or misleading. For instance, in 2007 when a number of new nuclear proposals began to advance, it was common for “Overnight Cost” estimates to be quoted
. For a project (such as solar or wind) whose construction period may be as short as several months, the difference between an “overnight” cost and the full cost to complete the project may not be significant. However, for a nuclear project that may typically take a decade to complete, cost escalations that occur during this long construction period, plus the financing costs during construction, may easily double the total cost of a project compared to its “overnight” cost. When the full picture is presented, some may perceive the total cost estimate has mysteriously doubled. However, it simply should have been stated clearly to begin with that major escalation and financing costs cannot be avoided when it takes a long time to complete a project. Failure to do so is tantamount to selling someone a house with “teaser” initial mortgage payments and failing to make clear that the mortgage payments will later reset to a much higher level.Another mysterious “black box” presentation method is to fold the overall costs of the new facility into the general rate base of the utility, without ever mentioning what the generation costs per kWh of the nuclear unit will be. Instead, it is often only presented how total costs per kWh for all ratepayers will increase — which includes kWh’s generated by existing generation units. (For instance, if a nuclear unit is to supply 20 percent of the kWh’s for the utility when it comes on line, any cost increase per kWh appears to only be 1/5 as large because the additional costs are also spread over the 80 percent of kWh’s generated by other facilities, even though those other facilities did not cause the rate increase.) While it is important to know the impact on final overall retail electric rates, it is also important to know the generation costs per kWh from the nuclear facility. If this step is “skipped” in public presentations, the nuclear units (or any new generation power source that is more expensive than existing units) can appear far cheaper than their real impact.
The Paper takes the approach that it is best to lay out in detail “how you got that number” at each step of the way. All parties can then proceed to have discussions based upon real numbers rather than mysterious “Black Box” secrets.
So feel free to criticize the analysis, but anyone offering different all-in cost estimates for power from new nuclear plants should detail their own assumptions and calculation. And simply pointing to the operating costs of existing paid-0ff nuclear plants doesn’t count as detailed analysis — my home would be very cheap to live in if I didn’t have a mortgage.
Also, it’s fine to call for aggressively developing 4th generation nuclear plants (as James Hansen does) — I’m all for such R&D — but that won’t help us meet 2020 climate targets, and probably won’t help us significantly meet 2030 targets. In any case, it is impossible to accurately project the real world all-in costs of noncommercial technologies that are still largely sitting on the drawing board.
The full study is here [PDF].
This post was created for ClimateProgress.org, a project of the Center for American Progress Action Fund.